PCI Pharma Services - 82,000 sq. ft. pharmaceutical packaging facility at CityNorth Business Campus, Meath.​​​

​​

End Client: PCI Pharma Services
Developer: McGarrell Reilly
Contractor: Fajon Construction
Electrical Contractor: Callaghan Electrical

​​​​

​

Project Background

​

Callaghan Electrical delivered the full electrical fitout for PCI Pharma Services’ new 82,000 sq. ft. pharmaceutical packaging facility at CityNorth Business Campus, Meath.

​

Developed by McGarrell Reilly and built by Fajon Construction, the project forms a key part of PCI’s European expansion strategy, increasing capacity for the final assembly, labelling and packaging of pharmaceutical products - particularly injectable therapies and drug-device combination products such as autoinjectors.

​

The state-of-the-art facility supports commercial pharmaceutical packaging, sterile injectables, oral solid dose products, temperature-controlled storage and integrated logistics. 

​

Designed to meet the highest sustainability and technical standards, the building targeted LEED Gold certification and achieved an A3 BER rating, incorporating advanced energy-efficient systems, rainwater harvesting and enhanced environmental controls.

The project was delivered in two phases: a base build shell fitout requiring full electrical fitout followed by an internal production and operational electrical fitout.​

​

Challenge

​

This was a large-scale, high-specification pharmaceutical project with strict compliance, sustainability and operational requirements.

​

Key challenges included:

​

  • Delivering an 82,000 sq. ft. facility to pharma-grade standards

  • Meeting LEED Gold and A3 BER energy performance targets

  • Coordinating across multiple stakeholders including design team, main contractor, specialist fitout teams and PCI Pharma Services teams.

  • Completing a highly aggressive Phase 2 fitout programme within just five months

  • Ensuring all systems were designed to support clean rooms, temperature-controlled environments and future production expansion

​

Pharmaceutical packaging facilities demand precision, reliability and full regulatory compliance. The electrical infrastructure needed to be robust, scalable and delivered without compromise to programme timelines.​​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

 

 

 

 

 

Solution - Phase 1, Base Build

​

Callaghan Electrical completed the full electrical installation for the base build shell, providing the critical infrastructure required to support future operational fitout.

​

Works included:

​

  • Installation of main electrical panels and distribution systems

  • General power and electrical services

  • Internal lighting including office and open-plan areas

  • Emergency lighting systems

  • Fire alarm installation and wiring

  • External electrical works

  • Electrical works to lorry bays / roller doors

  • Bathroom lift installation

  • Preparation of infrastructure to support future production systems.

​

​

Solution - Phase 2, Base Internal

​

Appointed as the electrical fitout partner for Phase 2, Callaghan Electrical delivered a full operational electrical installation across the entire premises under a highly compressed timeline.  The fitout covered:

​

  • Open warehouse areas

  • Two-storey office accommodation

  • Four production areas

  • Clean rooms

  • Ground floor operational space

  • Works included:

  • Lighting and general electrical services throughout

  • Fire alarm and fire detection systems

  • Aspirating smoke detection systems

  • Electrical installations for production areas and clean rooms

  • Changing facilities

  • Warehouse power and services

  • Cold rooms and freezer room installations

  • Installation and commissioning of a busbar system to support current and future production systems

​

The team coordinated closely with other trades and specialist suppliers to ensure seamless integration of electrical systems into regulated pharmaceutical production environments.

​

​

Benefits

​

The completed facility significantly expands PCI Pharma Services’ European packaging capacity, enabling:​

 

  • Increased production of injectable and drug-device combination products

  • Enhanced temperature-controlled storage capabilities

  • Scalable infrastructure to support future operational growth

  • Improved energy performance and sustainability credentials

  • A high-spec, compliant environment aligned with global pharmaceutical standards

 

For Callaghan Electrical, the project demonstrated our capability at scale within the life sciences sector, delivering complex, high-compliance electrical installations on accelerated programmes without compromising quality, safety or performance.

​